|
|
The incorporation of additional mission constraints maximizes the probability of project success and minimizes the cost and time required for the sophisticated hardware. Any discrete configuration mode, for example, effects a significant implementation of the incorporation of additional mission constraints. The evolution of specifications over a given time period adds overriding performance constraints to a large portion of the interface coordination communication. However, the greater fight-worthiness concept effects a significant implementation of the independent functional principle. In respect to specific goals, the structural design, based on systems engineering concepts necessitates that urgent consideration be applied to the incorporation of additional mission constraints. Thus, a constant flow of effective information adds explicit preformance limits to the anticipated fifth generation equipment. Based on integral subsystem considerations, any discrete configuration mode is further compounded when taking into account the product configuration baseline. The evolution of specifications over a given time period, in particular, adds explicit preformance limits to any associated supporting element. A constant flow of effective information adds overriding performance constraints to the evolution of specifications over a given time period. The subsystem compatibility testing presents extremely interesting challenges to the product configuration baseline. Based on integral subsystem considerations, any associated supporting element requires considerable systems analysis and trade off studies to arrive at the preliminary qualification limit. In respect to specific goals, the characterization of specific criteria effects a significant implementation of the evolution of specifications over a given time period. However, a large portion of the interface coordination communication adds overriding performance constraints to the anticipated fifth generation equipment. The fully integrated test program, based on integral subsystem considerations, necessitates that urgent consideration be applied to the preliminary qualification limit. The independent functional principle effects a significant implementation of the preliminary qualification limit. The preliminary qualification limit requires considerable systems analysis and trade off studies to arrive at the fully integrated test program. However, the characterization of specific criteria presents extremely interesting challenges to the greater fight-worthiness concept. The anticipated fifth generation equipment, similarly, must utilize and be functionally interwoven with the characterization of specific criteria. A constant flow of effective information, in respect to specific goals, necessitates that urgent consideration be applied to the greater fight-worthiness concept. The structural design, based on systems engineering concepts, as a resultant implication, necessitates that urgent consideration be applied to any associated supporting element.
3 responses total.
If you stand back, and squint your eyes, you can see interesting rifts or cracks in that work. I think the term is "crazed".
This is, of course, computer generated. The command in the title is what produced it. If you run it you'll get more of the same general flavor. It's the "Simplified Integrated Modular Prose Generator," originally a Honeywell giveaway gimick which is breifly decribed in Martin Gardner's "Time Travel and other Mathematical Bewilderments." I think I extended it slightly when I implemented it back around 1988 or so. I've been meaning to give it a more Grexian phrase base.
That was a helluva lot better than some of the stuff in my texts. And a lot easier to comprehend. SOmetimes I hate being back in school.
Response not possible - You must register and login before posting.
|
|
- Backtalk version 1.3.30 - Copyright 1996-2006, Jan Wolter and Steve Weiss